Rankings and data for smart money in Malaysia
TrendingNew property launches in Kuala Lumpur…Where to invest in property in MalaysiaStamp duty and legal fees in Malaysia…Maintenance fee in MalaysiaRTS Link Johor BahruKLCC new condo and luxury property…
Sunway Cochrane. Sunway Property on YouTube · 28 Sep 2025.

PropertyRanking

New property launches in Kuala Lumpur 2026–2027: ten projects with sales permits and handover dates

Ten new launches are on sale in Kuala Lumpur, all with a valid sales permit, and the earliest handover on a permit is January 2028. For each one we show the permit, the committed handover date, the permit price and the foreign-buyer floor, checked on 2 November 2026.

How this page is kept up to date Every figure in this ranking is re-checked against its source by the editors every month; last check: 2 November 2026. The text is re-read and its sources re-opened by the editors at least every two months. Last change to this page: 6 November 2026.

The ranking

Every figure checked 2 Nov 2026

#ProjectTenureFromRM psfTo railDueScore
1Sunway CochraneCochrane, CherasFreeholdRM 948,000—180 mOct 202910/10
2M AuroraOld Klang RoadFreeholdRM 492,960—390 mSep 20309/10
3Pavilion Damansara Heights, Royal SuitesDamansara HeightsFreeholdRM 754,000~2,000 avg70 mMay 20308/10
4Bangsar Hill Park, TalisaLorong Maarof, BangsarLeaseholdRM 914,000—410 mJan 20288/10
5Enlace Suites IIPantai Sentral Park, Pantai DalamLeaseholdRM 758,400—440 mMar 20308/10
6Sunway Velocity 3, Tower CSunway Velocity, CherasLeaseholdRM 663,000—550 mNot published8/10
7Khaya ResidencesJalan BangsarLeaseholdRM 877,000—300 mJun 20297/10
8Damansara LaverraBandar Sri DamansaraFreehold—~870 avg690 mQ2 20307/10
9Lofthill ResidenceJalan Raja Uda, Kampung BaruFreehold——100 mNot published6/10
10MAIA Mont'KiaraJalan Bayu Kiara, Mont'KiaraFreeholdRM 1,841,000—3.1 kmJun 20296/10
01

Sunway Cochrane

Sunway Property · Sunway Bhd

Area
Cochrane, Cheras, Kuala Lumpur
Type
Serviced apartments, 2 towers
Tenure
Freehold
Units
1,296
Built-up
650–1,001 sq ft
From
RM 948,000 (permit page, Nov 2026)
Completion
October 2029 (developer, sales permit page)
Sales permit
8824-5/09-2028/0795, valid to 29 Sep 2028 · on schedule (Teduh)
Status
Launched October 2025 · selling
Nearest rail
Cochrane (MRT Kajang Line) · 180 m
Green rating
Described as GreenRE-compliant by the developer (no rating published)

SIM score

10/10

  • Rail access180 m to Cochrane (MRT Kajang Line)4/4
  • TenureFreehold2/2
  • Listed developerSunway Bhd, listed on Bursa Malaysia2/2
  • Price publishedStarting price published by the developer2/2

Two freehold towers of serviced apartments on 5.4 acres beside Cochrane MRT, with 1,296 units of 650 to 1,001 sq ft in four layouts, linked by a bridge to the Sunway Velocity area. The developer quotes 60 m to the station through a covered link; our straight-line measure from the middle of the site is under 200 m. Cochrane is one stop from TRX. Prices come from the developer's sales permit page; handover is due in October 2029.

  • Unit sizes run from 650 to 1,001 sq ft, in four layouts.
  • Sunway's permit page gives Tower B from RM 948,000 to RM 1,645,000 and Tower A from RM 1,000,000 to RM 1,725,000 (checked 2 November 2026). The project page itself still shows no price.
  • Sales permit 8824-5/09-2028/0795, valid 30 September 2025 to 29 September 2028. Teduh classes the project as on schedule ("Lancar", data to 1 November 2026).
Sources (4)
  1. Sunway Property, Sunway Cochrane project page · accessed 28 Oct 2026
  2. The Edge Malaysia, launch report · 8 Oct 2025
  3. Sunway Property, developer licence and sales permits (APDL) · accessed 2 Nov 2026
  4. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
02

M Aurora

Mah Sing Group · Mah Sing Group Bhd

Mah Sing Group on YouTube · 20 May 2026.
Area
Old Klang Road, Kuala Lumpur
Type
Serviced residences with ground-floor retail
Tenure
Freehold
Units
1,544 · 2 towers of 46 storeys
Built-up
556–1,019 sq ft
From
RM 492,960 (permit price, Nov 2026)
Completion
September 2030 (developer, sales permit)
Sales permit
13262-2/03-2029/0221, valid to 18 Mar 2029 · on schedule (Teduh)
Status
Launched March 2026 · phase 1A 96% booked (Jan 2026)
Nearest rail
Jalan Templer (KTM Komuter) · 390 m
Green rating
GreenRE Silver (provisional), according to EdgeProp (Aug 2025)

SIM score

9/10

  • Rail access390 m to Jalan Templer (KTM Komuter)3/4
  • TenureFreehold2/2
  • Listed developerMah Sing Group Bhd, listed on Bursa Malaysia2/2
  • Price publishedStarting price published by the developer2/2

Mah Sing's first project on Old Klang Road: two freehold 46-storey towers of serviced residences on 5.2 acres, with one- to four-bedroom units and 1,544 units according to NST (one portal says 1,205). The approved sales permit lists prices from RM 492,960 to RM 856,560 and handover in September 2030. Rail access is by KTM Komuter rather than MRT or LRT; Jalan Templer station is under 400 m away in a straight line.

  • Gross development value: RM 660 million (NST, March 2026).
  • Sources disagree on the unit count: NST reports 1,544 units, one portal 1,205.
  • The approved permit lists prices from RM 492,960 (Tower B) and RM 495,360 (Tower A) up to RM 856,560. The project page advertises "from RM339,000 onwards" without saying what that figure includes, so we show the permit price (both checked 2 November 2026).
  • Sales permit 13262-2/03-2029/0221, valid 19 March 2026 to 18 March 2029. Teduh classes the project as on schedule ("Lancar", data to 1 November 2026).
Sources (7)
  1. New Straits Times, launch report · 10 Mar 2026
  2. StarProperty, sales gallery opening · 4 Mar 2026
  3. The Edge Malaysia, land acquisition · 7 Nov 2024
  4. Mah Sing, M Aurora project page (price) · accessed 29 Oct 2026
  5. EdgeProp, M Aurora unveiled (provisional GreenRE Silver) · 5 Aug 2025
  6. Mah Sing, developer licences and sales permits · accessed 2 Nov 2026
  7. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
03

Pavilion Damansara Heights, Royal Suites

Pavilion Group

1Pavilion Collection on YouTube · 26 Oct 2026.
Area
Damansara Heights, Kuala Lumpur
Type
Serviced suites, 51 storeys (phase 2)
Tenure
Freehold
Units
490
Built-up
452–1,679 sq ft
From
RM 754,000 · RM ~2,000 avg psf (permit price, Nov 2026)
Completion
May 2030 (developer, sales permit)
Sales permit
30216-2/01-2029/0022, valid to 5 Jan 2029 · on schedule (Teduh)
Status
Selling · sales permit from January 2026
Nearest rail
Pusat Bandar Damansara (MRT Kajang Line) · 70 m
Green rating
Designed to Singapore's BCA Green Mark system, according to The Edge (Apr 2026)

SIM score

8/10

  • Rail access70 m to Pusat Bandar Damansara (MRT Kajang Line)4/4
  • TenureFreehold2/2
  • Listed developerDeveloper not listed on Bursa Malaysia0/2
  • Price publishedStarting price published by the developer2/2

Phase 2 of Pavilion Damansara Heights, directly connected to Pusat Bandar Damansara MRT station, about 75 m away in a straight line. Royal Suites, a 51-storey tower of 490 units, is the more accessible of two residential towers; the other, Imperial Residences, sells from RM 5.07 million. The developer's permit page lists freehold tenure, prices from RM 754,000 to RM 4.67 million and completion in May 2030; the press put the average at about RM 2,000 per sq ft in April 2026.

  • At about RM 2,000 per sq ft, this is the most expensive project in the ranking per square foot.
  • The developer's permit page states freehold tenure and prices from RM 754,000 to RM 4,666,000 for the 490 Royal Suites (checked 2 November 2026).
  • Sales permit 30216-2/01-2029/0022, valid 6 January 2026 to 5 January 2029. Teduh classes it as on schedule ("Lancar", data to 1 November 2026).
Sources (3)
  1. The Edge Malaysia Weekly, phase 2 preview · 20–26 Apr 2026
  2. Pavilion Damansara Heights, sales permits (APDL) · accessed 2 Nov 2026
  3. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
04

Bangsar Hill Park, Talisa

Bangsar Hill Park Development (Sunsuria 51%, Suez Capital) · Sunsuria Bhd

Bangsar Hill Park Development on YouTube · 28 May 2025.
Area
Lorong Maarof, Bangsar, Kuala Lumpur
Type
Condominium, 2 blocks of 55 and 57 storeys
Tenure
Leasehold
Units
802
Built-up
917–1,478 sq ft
From
RM 914,000 (Oct 2026)
Completion
January 2028 (developer, sales permit)
Sales permit
7997-4/07-2027/0482, valid to 3 Jul 2027 · on schedule (Teduh)
Status
Under construction · 88% sold (Jul 2026)
Nearest rail
Bangsar (LRT Kelana Jaya Line) · 410 m
Green rating
GreenRE Silver

SIM score

8/10

  • Rail access410 m to Bangsar (LRT Kelana Jaya Line)3/4
  • TenureLeasehold (freehold scores 2)1/2
  • Listed developerSunsuria Bhd, listed on Bursa Malaysia2/2
  • Price publishedStarting price published by the developer2/2

Phase 2 of Bangsar Hill Park, on the site of the former Sri Pahang flats, with two leasehold blocks of 55 and 57 storeys and 802 units. Phase 1, Verdura, was completed and handed over in 2025; Talisa is the phase still under construction, with completion given as January 2028 and 88% sold reported in July 2026. Sunsuria, the listed partner, holds 51% of the developer, and prices start from RM 914,000. Bangsar LRT station is about 400 m away in a straight line.

  • Bangsar LRT station is about 400 m away in a straight line.
  • Older articles describe the project as freehold or as a Sunsuria–MKH joint venture. Both are wrong: it is leasehold, developed with Suez Capital.
  • On 29 October 2026 the developer's site listed 289 of the 802 units in blocks B and C as still available (219 in block B, 70 in block C), more than the 88% take-up announced in July 2026 would leave.
  • The developer's site lists block C from RM 914,000 to RM 1,723,000 and block B from RM 934,000 to RM 1,806,000 (checked 2 November 2026).
  • Sales permit 7997-4/07-2027/0482, valid 4 July 2026 to 3 July 2027, registered on Teduh as "Taman Bukit Bangsar" and classed as on schedule ("Lancar", data to 1 November 2026).
Sources (6)
  1. The Star, sales gallery and take-up · 23 Jul 2026
  2. EdgeProp, phase 1 topping out · 6 Aug 2024
  3. The Edge Malaysia, Talisa launch details · Jul 2023
  4. Bangsar Hill Park, developer site (prices and sales permit) · accessed 29 Oct 2026
  5. EdgeProp, Talisa take-up · 22 Jul 2026
  6. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
05

Enlace Suites II

IJM Land with Amona Group · IJM Corporation Bhd

Pantai Sentral Park (IJM Land) on YouTube · 8 Apr 2026.
Area
Pantai Sentral Park, Pantai Dalam, Kuala Lumpur
Type
Residential suites, 1 tower of 38 storeys
Tenure
Leasehold
Units
290
Built-up
506–2,034 sq ft
From
RM 758,400 (permit price, Nov 2026)
Completion
March 2030 (sales permit; IJM's launch release said end-2029)
Sales permit
13619-6/03-2029/0249, valid to 30 Mar 2029 · on schedule (Teduh)
Status
Launched August 2026 · selling
Nearest rail
Pantai Dalam (KTM Komuter) · 440 m

SIM score

8/10

  • Rail access440 m to Pantai Dalam (KTM Komuter)3/4
  • TenureLeasehold (freehold scores 2)1/2
  • Listed developerIJM Corporation Bhd, listed on Bursa Malaysia2/2
  • Price publishedStarting price published by the developer2/2

A single 38-storey leasehold tower of 290 units in the 58-acre Pantai Sentral Park masterplan, near Bangsar South, developed by IJM Land with Amona Group. IJM Corporation is listed on Bursa Malaysia, and the approved sales permit lists prices from RM 758,400 to RM 3.81 million. The project launched on 9 August 2026; the permit gives completion in March 2030. The score uses the existing Pantai Dalam KTM station, about 440 m away in a straight line, not the proposed MRT3 station.

  • IJM's announcement cites the proposed MRT3 Pantai Dalam station. MRT3 is not yet under construction: works are expected from 2027 and full operation in 2032. Our score uses the existing Pantai Dalam KTM station instead.
  • The first phase, Enlace Suites I, was 70% sold, with non-Bumiputera units sold out (IJM, Aug 2026).
  • The approved permit lists prices from RM 758,400 to RM 3,808,800. IJM's launch release quoted "from RM624,000"; we show the permit figure (checked 2 November 2026).
  • Sales permit 13619-6/03-2029/0249, valid 31 March 2026 to 30 March 2029. Teduh classes the project as on schedule ("Lancar", data to 1 November 2026).
Sources (4)
  1. IJM Land, launch announcement · 10 Aug 2026
  2. The Star, launch report · 10 Aug 2026
  3. Pantai Sentral Park, Enlace Suites II page (sales permit notice) · accessed 2 Nov 2026
  4. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
06

Sunway Velocity 3, Tower C

Sunway Property · Sunway Bhd

Sunway Property on YouTube · 28 Apr 2025.
Area
Sunway Velocity, Cheras, Kuala Lumpur
Type
Serviced apartments
Tenure
Leasehold
Units
701
Built-up
775–1,324 sq ft
From
RM 663,000 (Oct 2026)
Completion
Not yet published for Tower C (Towers A and B: May 2028, sales permit)
Sales permit
30685-2/08-2029/0631 on Teduh, valid to 19 Aug 2029 (tower not named) · on schedule
Status
Soft-launched October 2026 · 100+ online bookings
Nearest rail
Cochrane (MRT Kajang Line) · 550 m

SIM score

8/10

  • Rail access550 m to Cochrane (MRT Kajang Line)3/4
  • TenureLeasehold (freehold scores 2)1/2
  • Listed developerSunway Bhd, listed on Bursa Malaysia2/2
  • Price publishedStarting price published by the developer2/2

The third and last tower of Sunway Velocity 3, a leasehold block of 701 serviced apartments beside Sunway Velocity Mall in Cheras. Cochrane MRT and the Maluri MRT/LRT interchange are both about 550 m away in a straight line. Sunway Property, which is listed on Bursa Malaysia, publishes a starting price of RM 663,000 (October 2026). Tower C soft-launched online on 10 October 2026; no completion date is published for it yet, while Towers A and B are due in May 2028.

  • Towers A and B of the same project were 98% sold within two years (The Edge, Oct 2026).
  • Layouts include four-bedroom and dual-key units.
  • Teduh shows a second sales permit for Sunway Velocity Three, 30685-2/08-2029/0631, valid 20 August 2026 to 19 August 2029, without naming the tower; Sunway's permit page still lists only the first one, for Towers A and B (both checked 2 November 2026).
Sources (5)
  1. Sunway Property, Tower C project page · accessed 28 Oct 2026
  2. The Edge Malaysia, soft launch report · 15 Oct 2026
  3. The Edge Malaysia, phase 1 launch · 9 May 2024
  4. Sunway Property, developer licence and sales permits (APDL) · accessed 29 Oct 2026
  5. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
07

Khaya Residences

Bayu Mantap (Melati Ehsan group), with TNB

Bangsar South at night, next to Kerinchi LRT. Cropped.
Bangsar South at night, next to Kerinchi LRT. Cropped. Not the project. Photo *angys*, CC BY-SA 4.0.
Area
Jalan Bangsar, Kuala Lumpur
Type
Serviced apartments, 1 tower of 61 storeys
Tenure
Leasehold
Units
795
Built-up
630–2,427 sq ft
From
RM 877,000 (permit price, Nov 2026)
Completion
June 2029 (developer, sales permit)
Sales permit
30531-1/12-2027/1185, valid to 25 Dec 2027 · on schedule (Teduh)
Status
Launched May 2025 · under construction
Nearest rail
Kerinchi (LRT Kelana Jaya Line) · 300 m
Green rating
Provisional GreenRE (grade not published)

SIM score

7/10

  • Rail access300 m to Kerinchi (LRT Kelana Jaya Line)4/4
  • TenureLeasehold (freehold scores 2)1/2
  • Listed developerDeveloper not listed on Bursa Malaysia0/2
  • Price publishedStarting price published by the developer2/2

A 61-storey leasehold tower at the corner of Jalan Bangsar and Jalan Pantai Baharu, with 795 serviced apartments of 630 to 2,427 sq ft; the lease runs to 2117. It shares a retail podium with Menara TNB, the 43-storey office tower completed in 2025. Kerinchi and Abdullah Hukum LRT stations are both within about 350 m. Launched in May 2025, the sales permit gives completion in June 2029 and prices from RM 877,000.

  • The lease runs to 2117. Gross development value: RM 960 million.
  • The group's listed company, Melati Ehsan Holdings, is mainly a contractor; we could not confirm that the developing company sits under it, so the listed-developer point is not given.
  • The approved permit lists prices from RM 877,000 to RM 3,055,000 for 795 serviced apartments; the lease runs to 12 June 2117 (checked 2 November 2026).
  • Sales permit 30531-1/12-2027/1185, valid 26 December 2024 to 25 December 2027, registered on Teduh as "Menara Emas Bangsar (Residensi Khaya)" and classed as on schedule ("Lancar", data to 1 November 2026).
Sources (4)
  1. The Edge Malaysia, project and group profile · Jul 2025
  2. EdgeProp, project profile and indicative prices · 3 Jul 2026
  3. Khaya Residences, sales permit (APDL) · accessed 2 Nov 2026
  4. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
08

Damansara Laverra

Land & General · Land & General Bhd

Sri Damansara Barat MRT station, the nearest rail stop. Cropped.
Sri Damansara Barat MRT station, the nearest rail stop. Cropped. Not the project. Photo Wiki Farazi, CC0 1.0.
Area
Bandar Sri Damansara, Selangor
Type
Serviced apartments, 2 towers
Tenure
Freehold
Units
1,008
Built-up
725–1,150 sq ft
From
RM ~870 avg psf (average, Jul 2026)
Completion
Second quarter of 2030 (L&G at launch, reported by Bernama)
Sales permit
3981-42/06-2029/0406 on Teduh, matched by location, valid to 4 Jun 2029 · on schedule
Status
Launched May 2026 · about 61% booked on launch day
Nearest rail
Sri Damansara Barat (MRT Putrajaya Line) · 690 m

SIM score

7/10

  • Rail access690 m to Sri Damansara Barat (MRT Putrajaya Line)2/4
  • TenureFreehold2/2
  • Listed developerLand & General Bhd, listed on Bursa Malaysia2/2
  • Price publishedStarting price reported by the press only1/2

Two freehold serviced-apartment towers with 1,008 units on 2.8 acres of the former Sri Damansara Club site, by Land & General, the developer of the Bandar Sri Damansara township. Gross development value at launch was RM 752 million. It launched on 17 May 2026 with about 61% booked on the day, and completion is targeted for the second quarter of 2030. The press reports an average of about RM 870 per sq ft. Sri Damansara Barat MRT is about 690 m away in a straight line.

  • The site is on the Selangor side of Bandar Sri Damansara (PJU 9, Petaling district), so Selangor's rules for foreign buyers apply, not Kuala Lumpur's.
  • The developer quotes about 500 m to Sri Damansara Barat MRT; our straight-line measure is about 690 m.
  • L&G does not publish its sales permit online. Teduh lists, about 50 m from our map point for the site, "Residensi Seri Damansara" by Sri Damansara Sdn Bhd (the company behind L&G's Damansara Seresta and Damansara Livista), permit 3981-42/06-2029/0406, valid 5 June 2026 to 4 June 2029, on schedule ("Lancar"). We matched it by location; ask the developer to confirm the permit number.
Sources (5)
  1. StarProperty, launch report · 19 May 2026
  2. EdgeProp, project profile · 13 Jul 2026
  3. The Edge Malaysia, L&G plans · Nov 2025
  4. The Star (Bernama), launch and completion target · 18 May 2026
  5. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
09

Lofthill Residence

Armani Group

Armani Group on YouTube · 27 Aug 2024.
Area
Jalan Raja Uda, Kampung Baru, Kuala Lumpur
Type
Serviced apartments
Tenure
Freehold
Units
653
Built-up
610–1,917 sq ft
From
Not published by the developer
Completion
Not published by the developer
Sales permit
30641-1/08-2027/0692 on Teduh, valid to 1 Aug 2027 · on schedule
Status
Selling
Nearest rail
Raja Uda (MRT Putrajaya Line) · 100 m

SIM score

6/10

  • Rail access100 m to Raja Uda (MRT Putrajaya Line)4/4
  • TenureFreehold2/2
  • Listed developerDeveloper not listed on Bursa Malaysia0/2
  • Price publishedNo published starting price0/2

A freehold tower of 653 serviced apartments in Kampung Baru, about 95 m in a straight line from Raja Uda MRT station on the Putrajaya Line, which opened in March 2023. All 11 layouts are two-bedroom, some with dual keys. Armani Group does not publish a price or a completion date, though the project holds a sales permit on the national Teduh register, and the developer is not listed on Bursa Malaysia, so the score rests on rail access and tenure. Agent sites quote prices that we do not use.

  • The developer does not publish a price (project pages checked 29 October 2026). Agent sites quote entry prices from RM 617,000 to RM 865,000, so we show none.
  • Completion dates on portals range from 2028 to 2029; none comes from the developer.
  • The developer's sites show no sales permit. Teduh lists "Residensi Lofthill" by Lofthill Development Sdn Bhd, permit 30641-1/08-2027/0692, valid 2 August 2024 to 1 August 2027, on schedule ("Lancar", data to 1 November 2026). No completion date is published.
Sources (3)
  1. Armani Group, project page · accessed 28 Oct 2026
  2. Lofthill Residence official site · accessed 28 Oct 2026
  3. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026
10

MAIA Mont'Kiara

UEM Sunrise · UEM Sunrise Bhd

The Mont Kiara skyline seen from Bukit Damansara, 2019. Cropped.
The Mont Kiara skyline seen from Bukit Damansara, 2019. Cropped. Not the project. Photo Azreey, CC BY-SA 4.0.
Area
Jalan Bayu Kiara, Mont'Kiara, Kuala Lumpur
Type
Condominium, 2 towers of 45 storeys
Tenure
Freehold
Units
495
Built-up
1,485–2,982 sq ft
From
RM 1,841,000 (permit price, Nov 2026)
Completion
June 2029 (developer, sales permit)
Sales permit
30141-2/06-2029/0431, valid to 10 Jun 2029 · on schedule (Teduh)
Status
Selling · about 30% sold at preview (Aug 2026)
Nearest rail
Segambut (KTM Komuter) · 3.1 km

SIM score

6/10

  • Rail access3.1 km to Segambut (KTM Komuter)0/4
  • TenureFreehold2/2
  • Listed developerUEM Sunrise Bhd, listed on Bursa Malaysia2/2
  • Price publishedStarting price published by the developer2/2

Two 45-storey freehold towers by UEM Sunrise with 495 large units (1,485 to 2,982 sq ft) on 5 acres next to the Bukit Kiara forest reserve. The approved sales permit lists prices from RM 1.84 million and completion in June 2029; about 30% was sold at preview in August 2026. It is the only project in this ranking without a station within walking distance: the nearest, Segambut KTM, is about 3 km away.

  • Gross development value: RM 1.17 billion (The Edge Malaysia Weekly, Aug 2026).
  • The approved permit lists Block B from RM 1,841,000 and Block A from RM 2,273,500, up to RM 3,869,750 (checked 2 November 2026).
  • Sales permit 30141-2/06-2029/0431, valid 11 June 2026 to 10 June 2029, registered on Teduh as "Residensi Mahligai Alam Indah (MAIA)" and classed as on schedule ("Lancar", data to 1 November 2026).
Sources (3)
  1. The Edge Malaysia Weekly, preview report · 24–30 Aug 2026
  2. UEM Sunrise, permits and licences · accessed 2 Nov 2026
  3. Teduh, National Housing Department (project status from HIMS, data to 1 Nov 2026) · accessed 2 Nov 2026

Map data © OpenStreetMap contributors · tiles OpenFreeMap. Distances are straight-line, measured by SIM.

How the SIM score works

Each project gets a score out of 10 from four things anyone can check. Rail access (4 points): straight-line distance from the site to the nearest operating MRT, LRT, monorail or KTM station, measured by SIM on OpenStreetMap data — 4 points up to 300 m, 3 up to 600 m, 2 up to 1 km, 1 up to 1.5 km. Stations that are only planned, such as MRT3, do not count.

Tenure (2 points): freehold 2, leasehold 1, not published by the developer or the press 0. Listed developer (2 points): the developing company or its parent is listed on Bursa Malaysia, so its accounts are public. Price published (2 points): 2 when the developer publishes a price, 1 when the price was reported by the press, 0 when it only appears on agent listings.

Selection: residential projects in Kuala Lumpur and its immediate edge, launched or still selling in 2025–2026, by developers with at least one completed project. Ties are broken by distance to rail. Nobody paid to be on this list, and no payment can change a score.

A factual comparison, not a recommendation to buy. Prices change: always check with the developer and a lawyer before signing.

About this edition

This edition was rebuilt on 2 November 2026 around one question: what has each developer actually been allowed to sell, and when has it committed to hand over? In Malaysia a developer may only advertise and sell homes under an Advertising and Sales Permit (APDL) from the National Housing Department. The permit fixes the price range, the number of units and the expected completion date, and the department’s Teduh register tracks whether each project is on schedule, late or abandoned. We read the permit of each of the ten projects and its Teduh entry (data to 1 November 2026).

We do not say which project to buy. We show what can be checked, score it the same way for everyone, and say what is missing. Looking at the city centre only? See our KLCC property guide.

Sales permits, handover dates and the foreign-buyer floor

Project Sales permit valid until Teduh status Completion on the permit Permit price range Units at or above the foreign-buyer floor
Sunway Cochrane 29 Sep 2028 On schedule October 2029 RM 948,000 to RM 1,725,000 All of Tower A and part of Tower B (KL floor RM 1 million)
M Aurora 18 Mar 2029 On schedule September 2030 RM 492,960 to RM 856,560 None
Pavilion Damansara Heights, Royal Suites 5 Jan 2029 On schedule May 2030 RM 754,000 to RM 4,666,000 Part
Bangsar Hill Park, Talisa 3 Jul 2027 On schedule January 2028 RM 914,000 to RM 1,806,000 (developer’s site) Part
Enlace Suites II 30 Mar 2029 On schedule March 2030 RM 758,400 to RM 3,808,800 Part
Sunway Velocity 3, Tower C 19 Aug 2029 (second permit, tower not named) On schedule Not published for Tower C From RM 663,000 (developer) Not known
Khaya Residences 25 Dec 2027 On schedule June 2029 RM 877,000 to RM 3,055,000 Part
Damansara Laverra 4 Jun 2029 (matched by location) On schedule Q2 2030 (developer at launch) Not published Selangor floor to be confirmed with the land office: not known (no price published)
Lofthill Residence 1 Aug 2027 On schedule Not published Not published Not known
MAIA Mont’Kiara 10 Jun 2029 On schedule June 2029 RM 1,841,000 to RM 3,869,750 All

Sources: each developer’s permit page, checked on 2 November 2026 (Sunway, Mah Sing, Pavilion Damansara Heights, Bangsar Hill Park, Pantai Sentral Park, Khaya Residences, UEM Sunrise), the Teduh register for the status and for the three permits the developers do not publish (register data, readable without the search form: Lofthill, Sri Damansara Sdn Bhd, Sunway Velocity), and The Star (18 May 2026) for Laverra’s completion target.

How to read it:

  • “On schedule” is Teduh’s Lancar status. It means the department has no report of delay; it is not a guarantee of the handover date.
  • A permit that expires before completion (most of the ten, for example Talisa and Khaya) is normal: the permit covers the selling period and is renewed if units remain. Check that it is still valid on the day you book.
  • Permit prices can differ from advertised prices. M Aurora’s project page says “from RM339,000 onwards” and IJM’s launch release for Enlace Suites II said “from RM624,000”; the approved permits start at RM 492,960 and RM 758,400. Ask the developer what the lower figure includes before you rely on it.
  • Damansara Laverra is not on Teduh under that name. A permit held by Sri Damansara Sdn Bhd is registered as “Residensi Seri Damansara” about 50 m from the site. Ask the developer to confirm the number.
  • Sunway Velocity 3, Tower C: Sunway’s permit page still lists only the first permit, for Towers A and B. Teduh shows a second permit for the same company from 20 August 2026, without naming the tower.

New launches by area

Where a project’s area is stated on its permit page or in our sources, it is grouped here. Prices are permit prices and dates are completion dates on the permit, unless stated.

  • Old Klang Road: M Aurora. Permit price RM 492,960 to RM 856,560; completion September 2030.
  • Bangsar: Bangsar Hill Park, Talisa (January 2028), and Khaya Residences (June 2029), which Teduh lists as “Menara Emas Bangsar”.
  • Pantai Sentral Park: Enlace Suites II. Completion March 2030.
  • Mont Kiara: MAIA Mont’Kiara. Permit price RM 1,841,000 to RM 3,869,750; completion June 2029.
  • Damansara Heights: Pavilion Damansara Heights, Royal Suites. Completion May 2030.
  • Bandar Sri Damansara, Selangor side: Damansara Laverra. Developer target Q2 2030; no price published.

Sunway Cochrane, Sunway Velocity 3 Tower C and Lofthill Residence are in the table above.

Costs and rules that apply in 2026

Stamp duty, legal fees and monthly charges follow the national rules: see our stamp duty and legal fees guide and our maintenance fee guide. What depends on where these projects stand is the foreign-buyer floor. It is RM 1 million per unit in Kuala Lumpur and, for Selangor, a figure of RM 2 million reported by law firms (Damansara Laverra, on the Selangor side of Bandar Sri Damansara), with state consent under section 433B of the National Land Code. These figures come from law firms, not from a 2026 state circular. The Selangor source is a note of July 2020: it gives RM 2 million as the earlier threshold in most districts and reports a temporary RM 1.5 million for strata homes that applied only until 31 December 2020. Confirm the current threshold with the Selangor land office before you rely on it. (Mah Weng Kwai & Associates)

What to check on a KL new launch before you book

  • The developer’s licence and sales permit. Both numbers must appear on every advertisement. Type the project or developer name into Teduh: it shows the permit, its expiry date and whether the project is on schedule, late or abandoned. Projects are often registered under another name (Khaya is “Menara Emas Bangsar”, MAIA is “Residensi Mahligai Alam Indah”).
  • The completion date on the permit. It is the date the developer has declared to the department; the delivery period itself is set in the sale and purchase agreement.
  • The price range on the permit. It is the approved range; ask what a lower advertised figure includes.
  • Tenure. Freehold or leasehold, and for how many years: ask for it in writing. We list the freehold projects in the FAQ below.
  • Title type. Most projects in this list are serviced apartments; ask the developer which land use applies, and which rates of assessment tax and utilities follow from it.
  • The foreign-buyer floor. RM 1 million per unit in Kuala Lumpur; for Selangor, confirm the current figure with the land office (our source gives RM 2 million, dated 2020). State consent is required.
  • Rail. Count only stations in service. The MRT3 Circle Line’s route was only approved in July 2025 (Malay Mail), so any “near future MRT3” station does not exist yet; our scores ignore it.

FAQ

Which new condos in Kuala Lumpur are completed in 2026 or 2027? None of the ten projects in this list. The eight that publish a completion date are due between January 2028 (Bangsar Hill Park, Talisa) and September 2030 (M Aurora); next after Talisa come Khaya Residences and MAIA Mont’Kiara, in June 2029. For projects closer to handover, see our Mont Kiara top 10 and KLCC top 10.

Do all these projects have a sales permit? Yes, with two caveats: Damansara Laverra is matched to a permit by location only, and the second Sunway Velocity 3 permit does not name Tower C. All ten show a valid Advertising and Sales Permit and the status “on schedule” (data to 1 November 2026). For seven projects the developer publishes the permit on its own site; for Lofthill Residence, Damansara Laverra and Sunway Velocity 3 Tower C we found it on Teduh only.

Which new KL projects in this list are freehold? Six: Sunway Cochrane, M Aurora, Pavilion Damansara Heights Royal Suites, Damansara Laverra, Lofthill Residence and MAIA Mont’Kiara.

What is the lowest price on a permit in this list? RM 492,960, for M Aurora on Old Klang Road (Mah Sing permit page, checked 2 Nov 2026). The project page advertises “from RM339,000 onwards” without saying what that figure includes. Two projects publish no price.

Can a foreigner buy a new condo in KL? Yes, at RM 1 million or more per unit in Kuala Lumpur, with state consent. Every MAIA Mont’Kiara unit and every Sunway Cochrane Tower A unit is priced at or above that figure on the permit; in four other projects, and in Cochrane’s Tower B, only the higher-priced units qualify. M Aurora’s permit tops out below it. See our foreign buyers guide.

Which new KL launches are near an MRT or LRT station? The ranking gives the straight-line distance from each project to the nearest station in service. MRT3 stations are not counted: the line has no station in service.

How do I check a developer’s sales permit in Malaysia? Every advertisement must show the developer’s licence number and the sales permit number. Type the project or developer name into the Teduh register of the National Housing Department. It shows the permit, its expiry date and whether the project is on schedule, late or abandoned. Projects are often registered under another name, so try the developer’s name too.

What does an Advertising and Sales Permit (APDL) fix? A developer may advertise and sell homes only under this permit from the National Housing Department. The permit fixes the price range, the number of units and the expected completion date. It covers the selling period and is renewed if units remain, so check that it is still valid on the day you book.

Is the advertised “from” price the price on the permit? Not always. M Aurora’s page says “from RM339,000 onwards”, but its approved permit starts at RM 492,960. IJM’s launch release for Enlace Suites II said “from RM624,000”, while the permit starts at RM 758,400. We do not know what the lower figures include, so ask the developer in writing.

Does “on schedule” on Teduh guarantee the handover date? No. “On schedule” is Teduh’s Lancar status. It means the Housing Department has no report of delay for the project. The delivery period itself is set in the sale and purchase agreement, so read that document for the date the developer is bound to.

How we checked this page

We read each project’s Advertising and Sales Permit on the developer’s own page where it is published, and on the Teduh register for the rest. Permit data is dated 2 November 2026 and register data runs to 1 November 2026. Every project is scored by the same published method, with no hand adjustments. The page is written and reviewed by the Smart Invest Malaysia editors, who are responsible for it. Each change is dated in the page history.

What we do not rank

Any figure that only a sales gallery or an agent gives, and any handover date not written on a permit or announced by the developer. Lofthill Residence and Damansara Laverra publish no price, so none is shown. Ask the developer for the current price list and the permit number before you book.

Spotted an error, or a project we should look at? Write to the editors: we correct within 48 hours and date every change.

The SIM weekly letter

What changed in Malaysia this week, checked

New launches and price changes in our rankings, rule changes for foreigners, and what is on across Malaysia. One email a week, free. Unsubscribe in one click.

I am interested in (optional, you get only these sections)

We send a confirmation link first. Confirming also opens your free account (no password) to choose sections or delete everything. Your address is never sold or shared; see our privacy policy.

Spotted a mistake?

Tell us which figure or sentence is wrong. We check every report against the source and correct the page; see our corrections policy.

Update history

  1. Revised for what readers search: "new property launch in kl 2026". Questions and sections added or tightened; every fact checked against its source by the editorial team.
  2. Fuller project summaries; shorter costs section with links to our stamp duty and maintenance guides.
  3. Rebuilt around sales permits: each project now shows its Advertising and Sales Permit, its status on the Housing Department's Teduh register and the completion date on the permit. Prices now come from the approved permits where published, which changes several figures (Sunway Cochrane, M Aurora, Enlace Suites II, Khaya, Pavilion Damansara Heights, MAIA) and the order of the ranking. Pavilion Damansara Heights is now confirmed freehold by its developer.
  4. Updated for Budget 2027 (9 October 2026): the first-home stamp duty proposal is now sourced to the official Appendix 16 instead of the press, with no exemption above RM750,000.
  5. Updated for search intent: added a checklist for new launches and a five-question FAQ (2026-2027 completions, freehold, lowest price, foreign buyers, rail), and corrected the unsold serviced apartment value to RM16.28 billion from NAPIC.
  6. Prices and sales permits re-checked: M Aurora's developer now publishes a lower starting price (RM339,000), which moves it to first place; Talisa's price is now from the developer.
  7. Sources re-checked: figures confirmed against official sources, unverifiable statements removed.
  8. Rewritten from scratch: every figure re-checked against dated official sources, sources cited, interactive tool added, unverifiable claims removed.
  9. Revised on the previous version of the site.
  10. First published.

KL launches 2026Sales permitsCompletion datesMRTFreehold

More in this section

Privacy and cookie settings

Our own pages set no cookies. Two Google services can: Google Analytics, to count visits, and Google AdSense, to show ads.

Audience measurement (Google Analytics)

In the EU, UK and Switzerland it stays off until you allow it.

Advertising choices: (shown to visitors in Europe once ads are live), or turn off personalised ads at adssettings.google.com.

Details in our privacy policy.